-
Corrugated Plastic Sheets
-
Corrugated Plastic Packaging Boxes
-
Corrugated Plastic Sign Board
-
Plastic Corrugated Totes
-
PP Corrugated Sheet
-
PP Fluted Sheet
-
PP Corrugated Box
-
Coroplast Yard Sign
-
Corrugated Plastic Floor Protection Sheets
-
Corrugated Plastic Rolls
-
Corrugated Plastic Tree Guards
-
Corrugated Plastic File Box
-
Corrugated Plastic Pallet Dividers
-
Corrugated Plastic Furniture
-
Collapsible Pallets
OEM Polypropylene Corrugated Plastic Tote Boxes Antistatic
Description | Wholesale Custom Folding Waterproof PP Corrugated Antistatic Tote Boxes | Brand Name | FC Coroplast |
---|---|---|---|
Certification | ISO/RoHS/CE/SGS | Material | PP(Polypropelene) |
Color | Transparent, Black, White, Blue, Red, Or As Required | Size(L*W) | 1220×2440mm,1000×2000mm,1220×1830mm Or Customized |
Thickness | 1.5-10mm | GSM | 200-3600 |
Grade | Common,Corona Treated,Conductive,Flame-Retardant,anti-UV,edge Sealing, Printing Et Etc. | Feature | Water-proof, Light-weight,non-toxic,heat Resistance, Moisture Resistance |
Application | Advertising,Decoration,Printing,Furniture,Construction,Sign | Sample | Free Sample Available |
High Light | corrugated plastic tote boxes Antistatic,OEM polypropylene corrugated plastic tote boxes,OEM pp corrugated plastic box Antistatic |
Wholesale Custom Folding Waterproof PP Corrugated Antistatic Tote Boxes
Specification
Size :1000X1200,1000X2000,1220X2440,1220X1830,1500X3000mm,any customized sizes.
Thickness: 2-10mm
Color: white,transparent,black,yellow,green,blue,pink any customized colors.
Density : 200gsm--2500gsm.
Purity: Virgin,recycle.
Feature
1. Unaffected by water.
2. Stronger and more durable than corrugated fiberboard.
3. Extremely lightweight.
4. Won't rust, rot, mildew, or corrode like metal or wood.
5. Can be printed on easily and clearly.
6. Tear, puncture, and impact-resistant.
7. Can be scored, creased, stapled, nailed, stitched, folded & drilled
8. Can be made for die-cut.
9. Can be sonic or heat welded.
10. Resists a wide range of chemicals, grease, and dirt.
11. Can be produced with a non-skid coating on one side.
Application
1) UV digital printing and silk screen printing for advertising.
2) Protecting for decoration
3) Backplates and support plates for refrigerators freezers and washing machines.
4) Protecting plates for glass bottle pallets.
5) Packaging box for fruits, vegetables, etc.
6) Packaging for industrial packing
Product information:
Manufacturing Technique:
Factory profile:
We are one of the best facilities of pp corrugated sheets in China, specializing in researching, developing, and manufacturing eco-friendly corrugated plastic sheets for more than 20 years. Our factory covers an area of 30000 square meters with 4 production lines which have a stable production capacity. And we audit passed the ISO9001/ISO14001, RoHS, SGS, and CE system authorities, sufficient test equipment for high-quality products. Equipped with a professional R&D team and professional production machines, we have a good reputation in the market.
Certifications:
FAQ:
1. Factory: Are you a factory or trading company?
We are a professional manufacturer with more than 20 years experience in this market, our production capacity is ~~tons per day.
2. Can I take a view of the factory on-site or by video?
Certainly, very glad to welcome our clients to visit our factory by video or on-site.
3. Sample: How could I get a sample?
Smaller size sample normally is free of charge, but the air express costs are usually taken by the customer;
The new sample fee is USD50-150, we will return back sample fee since you place the order in the future.
4. Price: Could I get your company product price list?
Sure, please kindly tell us your requested details, such as length, width, thickness, density, color, and application, etc, we will offer you a quotation at the first time.
5. OEM&ODM or Custom Order: Could we place an order in OEM&ODM style to produce our own brand products in your factory?
Of course. We can offer our clients a customized design. What you need to do is to send us a drawing of your requested style with requirements; We will submit a sample for your approval.
6. Payment Terms: How do we arrange payment?
Generally T/T or L/C.
T/T: Telegraphic Transfer (wire transfer), 30% down payment, 70% balance upon before shipment or against copy bill of lading;
7. Lead Time: How soon we can get the shipment?
We will arrange the production once the order and payment are confirmed, it will take 7-15 days to arrange production and book shipping space in advance before goods are ready.
Contact:
Leo Lee
Email: marketingmanager@szydigital.cn
Whatsapp: +86 15762256612
Skype:+86 15762256612
Linkedin: FC Coroplast
FAQ:
1. Factory: Are you a factory or trading company?
We are a professional manufacturer with more than 20 years experience in this market, our production capacity is ~~tons per day.
2. Can I take a view of the factory on-site or by video?
Certainly, very glad to welcome our clients to visit our factory by video or on-site.
3. Sample: How could I get a sample?
Smaller size sample normally is free of charge, but the air express costs are usually taken by the customer;
The new sample fee is USD50-150, we will return back sample fee since you place the order in the future.
4. Price: Could I get your company product price list?
Sure, please kindly tell us your requested details, such as length, width, thickness, density, color, and application, etc, we will offer you a quotation at the first time.
5. OEM&ODM or Custom Order: Could we place an order in OEM&ODM style to produce our own brand products in your factory?
Of course. We can offer our clients a customized design. What you need to do is to send us a drawing of your requested style with requirements; We will submit a sample for your approval.
6. Payment Terms: How do we arrange payment?
Generally T/T or L/C.
T/T: Telegraphic Transfer (wire transfer), 30% down payment, 70% balance upon before shipment or against copy bill of lading;
7. Lead Time: How soon we can get the shipment?
We will arrange the production once the order and payment are confirmed, it will take 7-15 days to arrange production and book shipping space in advance before goods are ready.